first wet brush wet wall corrugated groove
Posted: Thu Dec 14, 2017 7:23 pm
<p>panels to reduce the rate of loss. 3, Sizing: add cement and sand (1: 2) plus construction glue into a paste, first wet brush wet wall corrugated groove, and then rub the polymer mortar in the corrugated groove wall and the floor baseline Inside. 4, loading plate: the mortar wall will be moved to put up the fight position, up and down on the baseline position, with a crowbar to pry the wall from the bottom so </p>
<p>that the board and the board between the tight. 5, in place: the wall pressed hard, so that the mortar out of the seam, to ensure full of mortar, wedges its temporary fixed. 6, correction: check with the flat, perpendicular to the 2 meters straight to the rule: iron pry correction, then wedges and rebar fixed up and down. 7, nailing: wall and wall panels connected parts must be ��6 �� 200mm steel oblique 45 �� into </p>
<p>the anchor. 8, fixed: 30 �� 30mm wooden wedge on both sides of the correction, the impact drill 45 �� angle in the middle of tenon or mortise hole, and then use ��6 �� 200mm steel anchor. 9, Grouting: Install the calibrated wallboard with cement mortar (1: 2) and add the construction glue into a polymer paste to fill the upper and lower seams and the joint between the board and the board, and pull out the wedge </p>
<p>Fill with mortar. 10, Slotted buried pipe: If buried buried pipelines, switch boxes, etc., available impact drill or portable saw cutting trunking installation, to be installed and then mortar polymer fill level. 11, the installation of the door frame: the door frame available plywood directly on the wall package door cover, with nail and wall anchoring, decorative plate cover. 12, plastering paint: the last coating can be </p>
<p><br />
<br />
</p>
<p>that the board and the board between the tight. 5, in place: the wall pressed hard, so that the mortar out of the seam, to ensure full of mortar, wedges its temporary fixed. 6, correction: check with the flat, perpendicular to the 2 meters straight to the rule: iron pry correction, then wedges and rebar fixed up and down. 7, nailing: wall and wall panels connected parts must be ��6 �� 200mm steel oblique 45 �� into </p>
<p>the anchor. 8, fixed: 30 �� 30mm wooden wedge on both sides of the correction, the impact drill 45 �� angle in the middle of tenon or mortise hole, and then use ��6 �� 200mm steel anchor. 9, Grouting: Install the calibrated wallboard with cement mortar (1: 2) and add the construction glue into a polymer paste to fill the upper and lower seams and the joint between the board and the board, and pull out the wedge </p>
<p>Fill with mortar. 10, Slotted buried pipe: If buried buried pipelines, switch boxes, etc., available impact drill or portable saw cutting trunking installation, to be installed and then mortar polymer fill level. 11, the installation of the door frame: the door frame available plywood directly on the wall package door cover, with nail and wall anchoring, decorative plate cover. 12, plastering paint: the last coating can be </p>
<p><br />
<br />
</p>