<P>Release wood floor paint: Before construction, the best approach to the floor in advance, placed in a well-ventilated place to open the box ventilation, one can release the wood floor paint taste. The second is to minimize the wet weather brought to the wood floor moisture, reduce the deformation may be brought in use, drums and sewing width and other issues.</P>
<P>Grasp the wood floor waxing time: After the wood flooring is best to use after a period of waxing, also known as sealed wax. This can try to evaporate the residual moisture in the construction, to extend the service life of the wooden floor.</P>
<P>Install the keel: Finally, before laying the hair board (big core board or ten centimeter board) with wooden keel leveling the ground, the board is divided into 1200 �� 600 specifications, each board spacing reserved for 1cm slit, so that the original ground The moisture easily emanated to prevent the wooden floor from drumming phenomenon. Clean up the residual soil residue on the ground, sprinkle some insecticide may be appropriate to prevent the reproduction of worms (mites, etc.).</P>
",, "