installation method
Posted: Thu Nov 09, 2017 6:56 am
<p>Moisture treatment of wooden floors should do so! Moisture is the task of laying the most important job before the wooden floor, moisture resistance is the most important wooden floor technical indicators. Flooring in the laying of the front of the moisture-proof work well, in the course of use, the moisture will slowly dip into the floor, resulting in floor swelling or edge Qiqiao. In particular, pay attention to moisture-proof wooden floor, so the laying of the moisture-proof measures before the wooden floor is very important.</p><p> Species, specifications, grades, colors and wood moisture content of wood flooring engineering materials should meet the design requirements and the provisions of the current national standards. The moisture content should not be more than 10% if the water content is not required by design. </p><p>Pre-installation of the grass-roots moisture-proof treatment. Laying the ground floor of the keel, hair floor, wood installation must be solid, straight. Wooden floor surfacing or bonding with the grassroots must be firmly without loosening. When not using the wool floor, directly in the keel on the floor, the primary and secondary keel spacing should be based on the length and width modulus of the floor</p><p>the main keel spacing of not more than 300mm, the floor joints in the keel midline. The keel method is used as a traditional way of installing wooden flooring. Will leave an overhead layer between the floor and floor, not easy to keel of water and inadvertently infused drinks, milk and other liquid volatile, easy to breed bacteria and pests. </p>