<p>female kestrel on both sides of the groove, when installed just to erect the plate, male and female falcon Apply a small amount of caulking mortar to assemble it. below to introduce the details of the installation of lightweight partition board knowledge. First, the installation process of light partition board 1, the structure of the surface, floor, floor clean up, sub-stall line, leaving the window openings. 2, from the side </p>
<p>of the main structure surface installation. In case of doors and windows position, from both sides of the door and window installation, the installation of the partition wall to stay in the middle of the final process, the width of the remaining width and width of the cut, installed in the final part. 3, plumbing electrical equipment should be the first point of release, the installation of partition board, drilling pre-</p>
<p>embedded parts or switch socket; need to cut the line when the lateral groove, the user self-grooving embedding, and then smooth the filling material, Ink line. 4, operating temperature: -10 degrees Celsius can be installed above. 5, slab processing. Second, the light partition wall installation points 1, check the partition wall geometry to meet the standard requirements shall prevail. 2, according to the chart, pre-</p>
<p><br />
<br />
</p>