<h3>1, floor board problems</h3>
<P>The first level of the staircase is facade, so the expansion and contraction of the floor should be taken into account when installing the floor. When the floor floor is installed to the elevation,<a href='http://bethebread.org/impermeable/3888.html'>ventajas del panel de pared hdpe</a> the space between the facade floor and the floor floor should be kept enough space. The floor of the floor on the ground floor, you can carry out the next step to install the stairs floor.</P>
<h3>2, the floor size of the problem</h3>
<P>In the installation of flat floor, the need to accurately measure the level of high correlation,<a href='http://bethebread.org/impermeable/1811.html'>wpc suelo y cubierta para barcos</a> to ensure that the measurement line and cutting the standard cut. The gap between the elevation and the plane is not allowed to exceed 0.5mm; facade or plane and the wall,<a href='http://bethebread.org/compuesto/3561.html'>importancia económica del plástico compuesto</a> the gap between the skirting board is not allowed to exceed 1mm; floor and floor surface joints, strengthen the floor does not allow more than 0.2mm, solid wood flooring Allow more than 0.5mm.</P>