must be measured accurately to ensure the coordination and the circular floor. At the same time, make sure all the cutting floors must be fixed with the base (if necessary, use extra bases) and keep it level, level and tidy. 7, in the laying of the floor, with a bubble level instrument leveling, floor height by support adjustment. 8, in the computer room placed heavier equipment, should be in the equipment base floor under the bracket, in order to prevent floor deformation.
the movable floor needs cutting, or when opening, use an electric drill to punch 6mm~, 8mm and a round hole at the opening corner, to prevent the veneer from breaking. Five, quality requirements 1, anti-static overhead floor and floor surface should be clean, no dust, legacy. 2, the floor surface without scratches, no peeling coating, while no damage. 3, after paving, the whole floor should be stable and solid,
people walking on it should not have a sense of vibration, there should be no sound. 4, the floor edge should be guaranteed for a straight line, adjacent floor dislocation is not greater than 1mm. 5, the height difference between adjacent plates is not greater than 1mm. Install the Raiders composite anti-static floor, small temporary house is here to share, I hope for your help to install composite anti-static flooring,