The second step is to put a plastic sheet on the ground to insulate the moisture, so that the plastic sheet is 10 cm above the ground in four corner.The third step is to lay the floor mat.
Be sure to allow for expansion, at the overlap of at least 5cm, and must be sealed with duct tape.To use more than ordinary floor board, and need to be constructed independently.
The floor will be heated after 24 hours of installation.In order to facilitate the heat conduction, the cushion material should not be too thick.
" , , , "