<P>Local soaking water: the water on the ground in a timely manner to clean up, observe whether significant changes in the wooden floor, there is a clear Alice side of the floor can notify manufacturers to replace the local manufacturers, workers will be partially demolished according to the scene and calculate the required floor repair Area, accounting related costs.</P>
<P>Local replacement of the floor: the workers need to check the floor before the need to change the stock and lot of wood flooring, because only the original floor color, the same specifications of the wooden floor to use, otherwise it can not be repaired.</P>
<P>Overall replacement, partial replacement of the floor: the best in the case of maintaining normal ventilation, dry the ground about two weeks until the ground dry, and then re-installed.</P>
",, "Statistics: Posted by qizhenapp — Thu Dec 07, 2017 5:06 pm
]]>