<P>Before construction, the best approach to the floor in advance, placed in a well-ventilated place to open the box ventilation. Through ventilation, minimize the moisture brought to the wood floor by rainy days, and reduce the possible deformation, druming and slot width in use.</P> ",, "Statistics: Posted by qizhenapp — Mon Dec 04, 2017 12:35 pm
]]>