2. After the customer leveling the ground to be placed for about 35 days (the number of days standing according to the cement thickness), and so the ground is completely dry before construction. Generally need to stand for about 30 days in summer, winter to be left for about 35 days.
3. Ai Ge floor 48 hours in advance delivery to the customer decoration site to adapt to the room climate environment, reduce the floor of the "small environment" climate change is not suited to trace deformation. 4. The customer needs to clean the ground before installation.
Related links:
Statistics: Posted by qizhenapp — Fri Nov 03, 2017 11:35 am
]]>