<p>first banquet hall, the Great Hall of the banquet hall floor pavement area, there are 12 kinds of graphics, graphics lines have more than 40, very complex.<a href="http://wpcfloormanufacturer.com/review/4069.html">pvc wood in the philippines</a><br/> The country's existing factories and flooring pavement are not covered, there is no mature pavement experience can learn from, you can imagine the pavement is difficult, difficult as much. At the beginning of the pavement, the technician carried out a detailed study and analysis on the flooring pavement operating environment, and discussed the possible problems in the pavement process, and formulated the corresponding emergency measures and measures. In the process of pavement, for the </p>
<p>parquet pattern component analysis,<a href="http://wpcfloormanufacturer.com/review/9981.html">composite balcony floor</a><br/> tongue and groove shaped processing and other problems, paving the technical backbone of the team, access to a large number of international and domestic information, repeated scientific demonstration, creatively solve these problems. Pavement team stationed in the Great Hall after the scene, since the demolition of the old floor began, a series of difficulties and tests will follow, one after another: one with the wall repair, pillow paste gold cross construction, banquet hall scaffolding, only The central area with Jinqiao company executive vice president Qu Mei You comrades knocked down the first nail hammer </p>Statistics: Posted by qizhenapp — Tue Oct 10, 2017 8:47 am
]]>