<p>prejudice to the operation shall prevail. 3, large area construction should be done before the model room, after the relevant quality department inspection, identification of qualified, you can carry out a large area construction. 4, the operation should be carried out before the handover inspection work, and the remaining issues properly handled. 5, wood base moisture content generally should not be greater than </p>
<p>12%. Four. Operation process 1, process flow: base treatment, polishing oil powder, full scraping oil puttyVarnish commonly used wood finishes, furniture surface, is a transparent coating. Varnish finish in the construction engineering, there may be some problems, such as the base, processing finishes appear on the flow and light loss problems, if these problems arise, how should solve? Xiaobian for everyone </p>
<p><br />
<br />
</p>Statistics: Posted by qizhenapp — Wed Aug 02, 2017 11:46 am
]]>